Material should always be visually inspected during installation. Materials must be stored in an area that is fully enclosed and weather-tight, with a permanent HVAC system set to a uniform temperature of 68 degrees and a relative humidity of 50-70% for at least 72 hours prior to and during the installation. Shaw Laminate Flooring Installation Video. Contact your Stagestep salesperson or our customer service representative as soon as possible. Be sure the photos are clear with good lighting and no glare. If you have any questions about the condition of the flooring you have received, or if the rolls have been removed from their packaging, please take multiple photos from different angles. Failure to do so may result in deformation of the vinyl product, for which Stagestep is not responsible.
Upon receipt, all rolls of vinyl flooring should be immediately removed from this box, inspected and stood upright on a perfectly level surface or leaned again a wall in the most upright position possible. The contents shipped to you should be contained in a large box on an 8’ pallet and be wrapped in plastic shrink-wrap. Please examine the packaging for any damage which may have occurred during transit.
Installation Preparation Inspection of Material Material should be delivered to the job site in its original unopened packaging with all labels intact.
Installer Cube Butane Average ratng: 4,0/5 5128reviews